Assembly magazine
Home
Subscription Customer Service
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Assembly Radio
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Web Extras
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Archives
Job Search
White Papers
Industry Links
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
Advertise
Subscribe
About Assembly
Staff Directory
Editorial Calendar
Reprints
2009 Plant of the Year Nomination Form
Search in: EditorialProductsCompanies
Assembly in Action: Hub Connection System Eliminates Downtime, Maintenance Issues

December 18, 2008

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



GBR Systems Corp. (Chester, CT) manufactures paper-handling equipment used by printers, marketers and direct mail companies to cut, fold and stitch their printed materials.

Recently, one of its machines began having problems because of the setscrews the company was using to secure a high-speed drive pulley to a 3/8-inch shaft. Specifically, GBR Systems found that the setscrews were loosening over time as a result of repeated clutching and braking at high speeds. This, in turn, would cause the machine to malfunction, often damaging the drive belt. Customers found themselves constantly having to retighten the setscrews, which resulted in lost productivity and increased maintenance costs.

To solve the problem, GBR Systems began securing the pulleys to the shaft using the Concentric Maxi Torque (CMT) system from drive and pulley manufacturer Custom Machine & Tool Co. (Weymouth, MA).

Comprised of a single screw and a hub with a tapered bore to match the CMT bushing, the CMT system allows for precise component positioning and tight runout control for demanding applications. Assembled parallel to the shaft, the system is easy to install, provides a positive connection without damaging the shaft, and eliminates the need for the secondary machining required by setscrews.

In operation, GBR System’s customers found that maintenance costs and downtime were dramatically reduced when supplied with pulleys using the CMT system.

First introduced in 2000, the CMT system can be used to secure timing pulleys, gears, sprockets, pinch rollers and couplings. It is available in 12 sizes for bores ranging from 0.125 inch to 1.187 inch.

With typical radial runout of less than 0.001 inch as assembled, the CMT system enables machine builders to attain higher drive speeds, reduce vibration and maintain concentricity. The mechanical shrink-fit approach of the CMT system provides a torque capacity far exceeding that of a two-setscrew arrangement, thereby offering a robust and reliable connection.

In addition, its compact design eliminates the need for the extended hubs often required to accommodate conventional setscrews, saving space and weight and shrinking design envelopes.

For more information on CMT pulleys and hub-to-shaft connections, visit www.cmtco.com.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. Troubleshooting the MIG Welding Process
  2. Note to Displaced Automotive Engineers: Uncle Sam Wants YOU!
  3. Appliance Assembly: Less Is More
  4. The Importance of ‘Green Shoots’
  5. Battery Manufacturing – Build It in the USA
  6. Process Control for Dispensing Gaskets
  7. Does Going Paperless Work?
  8. Leading Lean: A Tool for Lean Thinking
  9. Process Control for Dispensing Gaskets
  10. How to Evaluate Suppliers

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2009 BNP Media. All rights reserved. | Privacy Policy