Assembly magazine
Home
Subscription Customer Service
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Assembly Radio
Web Extras
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Archives
Job Search
White Papers
Industry Links
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
June 2009 BPA Statement
Subscribe
About Assembly
Staff Directory
Advertise
Reprints
Search in: EditorialProductsCompanies
We Fed It: One Bowl Better Than Two
by John Sprovieri
June 30, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



Equipped with quick-change tooling, this bowl can feed cartridges with the open end leading or trailing. Note how the tooling to feed the cartridges in the opposite direction is stored on the bowl itself. Photo courtesy Custom Feeder Co.
Sometimes, it’s the machine you don’t sell that wins you business.

That was the case for Mike Stamm, general manager of Custom Feeder Co. (Rockford, IL). Recently, an ammunition manufacturer contacted Stamm to build two vibratory bowls to feed 9 mm pistol cartridges at a rate of 120 parts per minute.

One bowl needed to feed the cartridges with the open end trailing, so an ejector groove could be machined around the cartridge body. The other bowl had to feed the cartridges with the open end leading, so the parts could be cut to length. Since both operations would be performed on the same machine, a complicated slide mechanism would switch from one bowl to the other.

Stamm had a better idea. Why not build one bowl to handle both jobs? Stamm and his team built a bowl with an inside track that feeds the cartridges upright, with the open end up. As the track winds to the outside of the bowl, it encounters a set of quick-change tooling that tips the cartridges forward or backward. Two bolts hold the tooling in place.

“We avoid adjustable tooling whenever possible, because we don’t want operators to dial in any parameters,” says Stamm.

Changeover takes less than two minutes, and the bowl feeds 160 cartridges per minute. In another bit of clever engineering, the opposite set of tooling is stored on the bowl itself, so operators never waste time looking for it.

For more information, call 815-654-2444 or visit www.customfeeder.com.

Editor’s note: This is the first installment of a regular series profiling parts feeders for automated assembly systems. Whether it’s a vibratory bowl, a tray feeder or a flexible robotic system, if you’ve solved a parts-feeding challenge, we’d like to hear about it. Send an e-mail to John Sprovieri, editor of ASSEMBLY, at sprovierij@bnpmedia.com, or call 630-694-4012.


John Sprovieri
sprovierij@bnpmedia.com
Editor

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. Wire Processing: Auto Industry Goes Metric
  2. This Is Not Your Father's Retirement
  3. Wire Processing: Auto Industry Goes Metric
  4. New Great Dane Plant to be Built in GA
  5. Assembly Automation: The Trouble With Springs
  6. Web Exclusive: More Techniques to Reduce Robot Cycle Times
  7. Assembly Automation: The Trouble With Springs
  8. The Hawthorne Works
  9. Hoffman on Testing: Cheap Fixtures Cost More in the Long-Run
  10. Budde on Assembly Automation: Getting the Most Out of Your Assembly and Test Equipment Provider

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2010 BNP Media. All rights reserved. | Privacy Policy