Assembly magazine
Home
Subscription Customer Service
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Assembly Radio
Web Extras
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Archives
Job Search
White Papers
Industry Links
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
June 2009 BPA Statement
Subscribe
About Assembly
Staff Directory
Advertise
Reprints
2010 Plant of the Year Nomination Form
Search in: EditorialProductsCompanies
Make vs. Buy Worksheet
by John Wirtz
December 1, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



                                                                                                                                            


                                                                                                                                Purchase/Outsource
Depth of experience in designing automated assembly and test (AA&T) systems ___    ___

Ability to integrate AA&T system into production process ___    ___

Ability to provide turnkey services ___    ___

Ability to absorb an AA&T project without disrupting the organization ___    ___

Ability to deliver the system on-budget ___    ___

Degree of protection from risk this option represents to customer ___    ___

Number of AA&T systems they have built in the past ___    ___

Ability of the organization to add value to the project ___    ___

Financial stability of the organization ___    ___

Ability to deliver the system on-time ___    ___

Ability of the organization to invest adequate capital in this project ___    ___

Ability to control design and engineering costs ___    ___

Ability to control labor costs ___    ___

Ability to reverse the decision, if necessary, and pull the plug quickly ___    ___

Ability of organization to command preferred pricing for raw materials ___    ___

Amount of floor space that is available for this project ___    ___

Ability to provide on-going support for maintenance and upgrades ___    ___

How the organization’s core competencies match project needs ___    ___

Ability and willingness to deal with frequent engineering changes ___    ___

Ability to provide a TS16949 quality level product ___    ___

Ability to monitor new technologies and R&D activity ___    ___

Ability of organization to command preferred pricing for equipment ___    ___

Ability to minimize waste ___    ___

Ability to provide adequate training, support and documentation ___    ___

TOTAL: ___    ___

How to Use This Worksheet
1.Fill in the chart above using the legend below.

2.Multiply each entry by the factor in column one. Not all criteria are equal. A factor of three means that point of comparison is three times as important as a point of criteria with a factor of one.

3.Total the columns to determine which option best suits your needs.

Legend
1 = Less than adequate.

2 = Adequate.

3 = More than adequate.



John Wirtz
jwirtz@whirlawaycorporation.com
Vice President
Whirlaway Corp.
Wellington, OH


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. Welding: Turning on a Spot
  2. Wind Turbines Demand Reliable Components
  3. In Indiana, Government Jobs Outpace Factory Jobs
  4. Assemblers Harness Wind Power
  5. AIA: Actuators Facilitate Automatic Welding
  6. Assemblers Harness Wind Power
  7. The Pros and Cons of Cells
  8. Automated Assembly: Get Agile
  9. Robotic Ultrasonic Welding
  10. Mixed-Mode Manufacturing: Software Strategy Is Everything

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2010 BNP Media. All rights reserved. | Privacy Policy
Your Feedback