Assembly magazine
Home
Subscription Customer Service
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Assembly Radio
Web Extras
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Archives
Job Search
White Papers
Industry Links
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
June 2009 BPA Statement
Subscribe
About Assembly
Staff Directory
Advertise
Reprints
2010 Plant of the Year Nomination Form
Search in: EditorialProductsCompanies
Assembly In Action: Robot, Gantry Reduce Welding Times

October 29, 2007

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



By upgrading to an automated system, NPK Construction Equipment Inc. has dramatically reduced cycles time for its major weldments.
NPK Construction Equipment Inc. (Walton Hills, OH) manufactures heavy-duty grapples, hydraulic hammers, crushers and cutters that are mounted on cranes and excavators.

This past summer, the company opened a new manufacturing facility in Wickliffe, OH, to meet strong demand in the construction and demolition industries. Included in the new plant is a robotic gantry welding station, built by SmartTCP (Farmington Hills, MI). The system, which employs a KR 6 Arc six-axis robot and controller from Kuka Robotics Corp. (Clinton Township, MI), a gantry from Güdel Inc. (Ann Arbor, MI) and custom SmartTCP system software, is used to perform large weldments in a high-mix, low-volume assembly environment.

“Our sales and production volumes of construction attachments were steadily increasing over the past few years, and we found it challenging to keep up using our original manual weld process,” says NPK President, Dan Tyrrell. “We needed to increase our weld capacity, and as we conducted our research, it was apparent that there was a lack of adequate fast automatic programming options that would minimize our down time, until we found the SmartTCP Automatic Welding solution. It is the only comprehensive welding system that provided the ease-of-use, speed and quality we were looking for without sacrificing the flexibility that our welding operations require.”

The new system saves on labor costs and shortens welding times significantly, in the process increasing manufacturing capacity and improving NPK’s bottom line. The savings have been especially dramatic in light of the ongoing shortage of qualified welders on the market.

In one example, NPK was able to reduce the welding time for one of its products from 2.5 hours to 30 minutes. Installation of the SmartTCP system took just 3 weeks.

For more on automated welding, call 248-994-1041 or visit www.smarttcp.com.

For more on gantries and other motion systems, call 734-214-0000 or visit www.gudel.com.

For more on robots, call 866-873-5852 or visit www.kukarobotics.com.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. Welding: Turning on a Spot
  2. Wind Turbines Demand Reliable Components
  3. In Indiana, Government Jobs Outpace Factory Jobs
  4. Assemblers Harness Wind Power
  5. AIA: Actuators Facilitate Automatic Welding
  6. Assemblers Harness Wind Power
  7. The Pros and Cons of Cells
  8. Automated Assembly: Get Agile
  9. Robotic Ultrasonic Welding
  10. Mixed-Mode Manufacturing: Software Strategy Is Everything

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2010 BNP Media. All rights reserved. | Privacy Policy
Your Feedback