Assembly magazine
Home
Subscription Customer Service
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Assembly Radio
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Web Extras
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Archives
Job Search
White Papers
Industry Links
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
Advertise
Subscribe
About Assembly
Staff Directory
Editorial Calendar
Reprints
2009 Plant of the Year Nomination Form
Search in: EditorialProductsCompanies
Assembly in Action: Robots Handle Doors and Axles

October 1, 2006

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



BMW Group (Munich, Germany) produces both 1 Series compact cars and 3 Series sedans at its plant in Regensburg, Germany. Long committed to automated assembly, the company recently decided to automate the handling of its front and rear axles, as well as the doors for both types of automobiles. Among other goals, BMW wanted a system that would be flexible enough to adapt to changing product requirements.

For handling the front and rear axles, BMW installed three heavy-duty, six-axis robots from Kuka Robots (Augsburg, Germany): a KR 500 model and two KR 360s. The KR 500, which has a payload of 500 kilograms, takes the assembled front axles from the production line and sets them down on an assembly aggregate carrier (known as a MAT). The KR 500’s combination gripper is capable of working with the different axles that go into the 1 Series and 3 Series. It also secures the moving parts on the each axle during transport, so the various parts will be correctly position on the MAT for processing.

The KR 360 robots, which each have a payload of 360 kilograms, are responsible for handling the rear axles. The first KR 360 places the axles in a magazine on a combination workpiece-carrier. The second KR 360 then unloads the magazine and sets the axles down on the MAT. To ensure they are in the optimal position for their assigned tasks, the KR 360s are mounted on a pair of bases, each 1.5 meters high. They are equipped with grippers that can accommodate all the axle types that pass through the Regensburg plant.

For handling the car doors, BMW uses four KR 150 robots, which work in pairs. In each pairing, one KR 150 is assigned to the front doors and one to the rear doors. Each robot’s sequence begins when an electric overhead conveyor arrives at the station with an empty hanger. One of the KR 150s then lifts the hanger out of the conveyor vehicle and moves it down a level, ready for loading. A pair of operators loads the required doors into the hanger and the robot reconnects the hanger to the conveyor.

Because of their high repeatability, the robots are able to avoid damaging either the doors or the conveyor, something that had been a problem in the past.

During typical operation, neither of the two pairs of robots is required to run at its maximum capacity. That way, if any of the robots break down or need to be stopped for maintenance, the remaining machines can take up the slack, avoiding any interruptions in production.

For more on robotic production, call 866-873-5852 or visit www.kukarobotics.com.



|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. Troubleshooting the MIG Welding Process
  2. Note to Displaced Automotive Engineers: Uncle Sam Wants YOU!
  3. Appliance Assembly: Less Is More
  4. The Importance of ‘Green Shoots’
  5. Battery Manufacturing – Build It in the USA
  6. Does Going Paperless Work?
  7. Leading Lean: A Tool for Lean Thinking
  8. Process Control for Dispensing Gaskets
  9. How to Evaluate Suppliers
  10. Advanced Leak Test Methods

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2009 BNP Media. All rights reserved. | Privacy Policy