Assembly magazine
Home
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Web Extras
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Podcasts
Archives
Job Search
White Papers
Industry Links
Contract Assembly Services
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
Advertise
Subscribe
About Assembly
Staff Directory
Editorial Calendar
Reprints
Search in: EditorialProductsCompanies
Wire Makes the World Go Round: A Company Ahead of Its Time

June 6, 2007

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



For many years, Western Electric Co. (New York) was one of the largest wire processors in the world. The company boasted that it manufactured “43,000 varieties of telephone apparatus.” It invested heavily in state-of-the-art automated equipment to assemble complex wire harnesses used in telephone switching systems and other advanced telecommunications gear. Western Electric engineers also developed numerous time-saving innovations in-house, which ASSEMBLY frequently reported on.

For instance, an article in the September 1964 issue described a hand-held cable binding tool that would “form a plastic lacing loop around loose wire, draw the loop tight and fasten it with a staple to make up a secure wire bundle. The old method of binding the wire bundles by hand with rayon cord required 40 percent of the total manufacturing time.”

A news item in the January 1972 issue explained how Western Electric engineers used computers, tape recorders and tiny short-wave broadcasting systems to help assemblers “weave” as many as 10,000 individual strands of wire onto large boards studded with strategically placed nails. Some of the more complex harnesses required 300 or more pages of computer-generated instructions.

A system called “instant memory” consisted of a tape-recorded message that told operators which wire to pick and how to weave it onto the board. Assemblers were equipped with headsets and a foot-operated switch that controlled the tape recorder. According to the article, “engineers found that the method provided an average increase in efficiency of 20 percent and a decrease in defects and repairs of 50 percent.”

For more information on the remarkable history of Western Electric, including its famous Hawthorne Works factory in Chicago, see “Assembly Then & Now: The Hawthorne Works” in the August 2002 issue of ASSEMBLY.




Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. About That Bailout...
  2. Capital Equipment Spending Survey: A Modest Increase
  3. Leading Lean: Build Common Understanding
  4. Enough Already About Safety Glasses!
  5. Advanced Leak Test Methods
  6. Planning 5S? First Know Why!
  7. The Right Way and Wrong Way to Use Power Tools
  8. Glossary of Ergonomic Terms
  9. The Human Side of Lean
  10. Torque Trade-Offs

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2008 BNP Media. All rights reserved. | Privacy Policy