Assembly magazine
Home
Online
Industry Headlines
AssemblyBlog
ASSEMBLYtv
Buyers Guide
Showrooms
Product Review
How To Guides
Webinar
Web Extras
Ask ASSEMBLY
Calendar of Events
eNewsletter
Current Issue
Cover Story
Features
Departments
Digital Edition
Resources
Podcasts
Archives
Job Search
White Papers
Industry Links
Contract Assembly Services
Website Review
E-Cards
Market Research
List Rental
Classified Ads
ASSEMBLY Info
Advertise
Subscribe
About Assembly
Staff Directory
Editorial Calendar
Reprints
Search in: EditorialProductsCompanies
Assembly Plant of the Year: Supply Chain Efficiency Is Key to Success

November 9, 2005

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



The 2005 Assembly Plant of the Year owes some of its success to an efficient supply chain system. The Xerox Worldwide Production Systems Manufacturing Plant (Webster, NY) has focused its efforts on improving just in time delivery and reducing time to market. Over the past 3 years, the plant has achieved a 22 percent decrease in days of total inventory.

Raw materials and components are either moved directly to point of use as received, or warehoused for subsequent replenishment. Kitting of materials, vendor pack or kanban are used for line replenishment. Vendor managed inventory is used for packaging material and hardware. Finished goods and products are packaged for final customer shipments.

Because of Lean Six Sigma, the plant has achieved some dramatic improvements in material cost reduction, notes Joao Borges, vice president of worldwide production systems manufacturing. He says cost reductions are done in two ways: parts cost and assembly labor and overhead cost reductions.

“For parts cost, we use one process that we call PCE (product cost engineering) – best of breed that establishes cost targets for each one of the components of the machines,” Borges points out. “Together with our suppliers, we drive the reductions. This is an extremely disciplined process and we establish cost reduction targets. Everyone in the chain--design, purchasing and manufacturing--is committed to it.”

Approximately 40 percent of the parts used to assembly the iGen3 110 digital production press are delivered in small lots on a just-in-time basis vs. 50 percent for the Nuvera machine.

“On all modules that we buy [from suppliers] we use special transportation fixtures that [serve as] the kanban signal for suppliers to send more material,” explains Borges. “We have an open purchase order and shipments are released when carts are returned to suppliers. Although we are improving a lot, there is always room for improvement on inventory management.”




Did you enjoy this article? Click here to subscribe to the magazine.

Most Emailed Articles

  1. About That Bailout...
  2. Capital Equipment Spending Survey: A Modest Increase
  3. Leading Lean: Build Common Understanding
  4. Enough Already About Safety Glasses!
  5. Advanced Leak Test Methods
  6. Planning 5S? First Know Why!
  7. The Right Way and Wrong Way to Use Power Tools
  8. Glossary of Ergonomic Terms
  9. The Human Side of Lean
  10. Torque Trade-Offs

Top Searches

  1. Lean Workstation
  2. leak testing
  3. torque
  4. lean
  5. wave solder
  6. Plants
  7. model t
  8. fuel cell
  9. robots
  10. ritter

Most Popular Articles

  1. Mind the Gap 2/20/08
  2. Leading Lean: Build on Your Success 12/17/07
  3. Assembly in Action: Supplier Key to Machine Builderís Success 5/25/07
  4. Ball Grid Array Soldering 1/25/08
  5. Putting the Squeeze on Rivets 12/17/07
  6. Nanotechnology Transforms Lithium-ion Batteries 2/4/08
  7. Successful Design For Assembly 2/26/07
  8. Leading Lean: Make Everything Visual 6/25/07
  9. Leading Lean: Your Lean Library 11/27/07
  10. Select a Workstation for Lean Manufacturing 7/16/07
© 2008 BNP Media. All rights reserved. | Privacy Policy