Assembly Magazine logo
search
Ask ASSEMBLY AI
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Assembly Magazine logo
  • TRENDS
    • Ask ASSEMBLY AI
    • Trends
    • News
    • New Products
  • INDUSTRIES
    • Aerospace
    • Appliance
    • DFMA Assembly
    • Medical Devices
    • Green Manufacturing
    • Lean Manufacturing
    • Machinery Assembly
    • Electronics Assembly
    • Automotive
  • TECHNOLOGIES
    • Adhesives & Dispensing
    • Assembly Presses
    • Automated Assembly Systems
    • Manufacturing Management
    • Manufacturing Software
    • Motion Control
    • Screwdriving & Riveting
    • Robotics
    • Test & Inspection
    • Plastics & Metal Welding
    • Wire Processing
    • Workstations
  • AUTONOMOUS & ELECTRIC MOBILITY
    • AEM Magazine Archives
    • Autonomy
    • Electrification
    • Mobility Services
    • Assembly & Testing
    • AV/EM News
  • MEDIA
    • Ask ASSEMBLY AI
    • Podcasts
    • Assembly News Now
    • Assembly TV
    • Webinars
    • eBooks
  • EVENTS
    • Calendar
    • The ASSEMBLY Show
  • MORE
    • Exclusives >
      • Plant of the Year
      • Capital Spending
    • Buyers Guide >
      • Supplier Insights
    • Classifieds
    • Featured Products
    • Newsletters
    • Store
    • White Papers
    • Columns
    • Sponsor Insights
  • INFOCENTER
    • Assembly & Test Solutions
  • EMAGAZINE
    • eMagazine
    • Archive Issues
    • Advertise
    • Contact Us
    • Sign Up
Automotive AssemblyAssembly PressesRobotics Assembly

Controlling Control Arm Assembly

By Jim Camillo
September 4, 2012
Assembling control arms for one of America’s most popular car manufacturers is a challenge at many levels for ZF at its Lapeer, MI, plant. The assembly process includes precision machining a cast aluminum control arm, fixturing the arm multiple times, and installing a multicomponent ball joint, a hydrobracket and a bushing in the arm.

After this, the assembled components are tested for both location and function. Cycle time is only 10 seconds, meaning ZF must perform precise assembly at a high production rate.

To meet this challenge, the worldwide automotive supplier is using an advanced robotic assembly and test system developed by ESE LLC. The system was installed at the end of 2011, just in time to support the plant’s need to increase production.

“For several years, ESE had supplied the ZF plant with a manual system that assembled ball joints in control arms and performed a torque test to verify the function of bushings,” says Eric Smith, president of ESE LLC. “The new system adds robotic automation to integrate four separate operations performed on the control arm into a single process. The system features 13 robots and four dial tables, each of which is laid out as a ring with process workstations located around the periphery.”

Four of the robots are mounted to a pillar, which workers call the Christmas tree, because the robots hang like branches from a trunk and reach down to retrieve control arms. The control arms are cast aluminum that are machined to produce a pocket for the ball joint and mounting locations for the resilient bushing. These features are precision machined to allow for the assembly of the ball joint and bushing per the OEM’s requirements. Nine other support robots positioned inside and outside the dial tables move arm components (including sealing rings, bushings and ball joint boots) to and from the dial tables during production.

The Ball Joint Assembly

Assembly begins when a pillar-mounted robot removes a control arm from a conveyor and places it in a fixture on dial table one, which turns 30 degrees every few seconds. The table heats the control arms to facilitate insertion of the ball stud. Dial table 1 features a vision inspection system to ensure proper ball joint assembly.

Support robots place a ball stud and plastic liner in the pocket, apply precise amounts of two types of grease, and fold over the lip of the pocket to hold the pieces together. Then a rolling tool machine powered by an Electro-Mechanical Assembly Press (EMAP) installs the ball joint. After this, a serial number, date code and other quality assurance information is pin stamped on the control arm.

Made by Promess Inc., the EMAP is essentially a CNC press powered by a servomotor. The press can precisely apply up to 40 kilonewtons of linear force to the machine’s rolling head while accurately controlling its position in relation to the fixtured control arm.

Looking for quick answers on assembly and manufacturing topics? Try Ask ASM, our new smart AI search tool. Ask ASM →

The EMAP is equipped with an array of sensors to measure position, force, and any number of other process parameters that may be necessary. It then feeds this data back into the control system.

With the ball joint installed, a support robot moves the control arm onto a four-lane accumulating conveyor. This is done to allow time for cooling before the ball joint assembly is function tested at dial table 2 in the next workstation. Dial table 2 also is equipped with a vision inspection system.

Here, a Promess TorquePRO motorized torque assembly and test unit articulates and spins the stud to ensure that it meets functional requirements. The TorquePRO consists of a servomotor, an encoder and a torque transducer all controlled by a PRO-MC motion controller. It can measure torque in either direction of rotation, provides angular position feedback, and can also apply other motions required to exercise an assembly during testing.

The motion controls on the Promess EMAP and TorquePRO are easy to program. ESE engineers received training and support from Promess on other projects when ESE used Promess equipment. However, this time the ESE engineers were able to program the assembly and test system completely on their own.

The motion controls facilitate data acquisition by communicating with the system master control and the plant network via ProfiBus. The system also stores data generated during the assembly process for statistical analysis.

Hydrobracket and Bushing Installation

Next, a robot moves the control arm with ball joint assembly to dial table 3, where the hydrobracket is installed. The hydrobracket is one of the chassis attachment points for the control arm.

Hydrobrackets flex during installation, making them difficult to install to the precise location required to function properly on the vehicle. ESE met this challenge by using an 80-kilonewton EMAP, coupled with a digital sensing probe to feed back the exact location of the hydrobracket.

During installation, the hydrobracket is pressed to an initial position and then the pressure is removed so the location can be measured. Using that data as a reference, the EMAP is stroked slightly and stopped so the position can be measured again. The press, stop and measure cycle is repeated until the hydrobracket is exactly in the specified location on the control arm.

The precision and responsiveness of the EMAP makes this process easy to do. Feedback from the digital sensing probe also provides data about the characteristics of the hydrobracket and allows ESE to flag an out-of-spec part should one get into the assembly process.

A bushing is installed on the control arm at dial table 4. The bushing is pressed to position with the 80-kilonewton EMAP and a digital probe. Because the bushing has a conventional design, it doesn’t creep back like the hydrobracket does during installation. Nevertheless, a digital probe is used to monitor the position of the bushing and stop its installation when the bushing is in the specified location on the control arm.

Finally, an alphanumeric code is affixed to the control arm, and a robot carries the finished part to one of the exit conveyors.

“Meeting ZF’s dual challenge of precise assembly at high production rates was a tall order for us, but one the company could fill through its experience and technology,” says Smith.

For more information on the EMAP, call Promess at 810-229-9334 or visit www.promessinc.com. For more information on assembly and test systems, call ESE at 810-538-1000 or visit www.esellc.net.        

 

KEYWORDS: bushings force displacement monitoring press-fit assembly

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Jim was a senior editor of ASSEMBLY and has more than 30 years of editorial experience. Before joining ASSEMBLY, Camillo was the editor of PM Engineer, Association for Facilities Engineering Journal and Milling Journal. Jim has an English degree from DePaul University.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Made in the U.S.A.

    Consumer Products Manufacturing: Made in the USA

    Supply chain lessons learned during the coronavirus...
    Automated Assembly Systems
    By: Austin Weber
  • Best Practices for Press-Fit Assembly

    Best Practices for Press-Fit Assembly

    In manufacturing, ironclad formulas for success are hard...
    Assembly Presses
    By: Jim Camillo
  • aem0523leader-tesla1.jpg

    Tesla Rethinks the Assembly Line

    Engineers at Tesla Inc. have developed a new process that...
    Assembly and Testing
    By: Austin Weber
Manage My Account
  • eMagazine Subscription
  • Assembly Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the ASSEMBLY audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of ASSEMBLY or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • ultrasonic welding
    Sponsored bySonobond Ultrasonics

    Engineering Efficiency in High-Performance Assembly: How Ultrasonic Welding Enhances Throughput, Reliability and Quality

  • UV curing system
    Sponsored byDymax

    Why UV Intensity Alone Doesn’t Define Curing Performance

  • wooden pallets
    Sponsored byLEAN Manufacturing Products

    Eliminating Waste on the Shop Floor: Applying Lean Principles to Improve Manufacturing Efficiency

Popular Stories

ASSEMBLY News Now, episode-30: Volvo Redesigns EV Manufacturing

Volvo Redesigns EV Manufacturing

Boeing CEO Kelly Ortberg announces 1 billion investment

Boeing Plans $1 Billion Wichita Investment, Workforce Training Center

automated consumer goods assembly system

Best Practices for Cycle Time Optimization

Watch the latest episode of ANN now!

Events

July 24, 2025

From Shop Floor to CFO: How Manufacturers Are Closing the Loop Between Operations and Finance

On Demand Learn how manufacturers are bridging the gap between the shop floor and ERP systems to gain real-time visibility, streamline operations, and kick-start digital transformation—without waiting years.

Sponsored by:

PicoStratusGreen
July 30, 2025

Buffer Analysis and Design Fundamentals for Manufacturing Excellence

On Demand In this presentation, Dr. Herman Tang shares practical insights from his industry experience and research on buffer management in manufacturing operations.

View All Submit An Event

Poll

Difficult Assembly Processes

Which assembly process gives you the most difficulty?
View Results Poll Archive

Products

Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs

Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios: Systematic and Systemic Improvement of Manufacturing Costs

See More Products
Register for webinar - Modernizing Automotive Assembly: Why Upgrading Legacy MES is a Business Imperative

Related Articles

  • FlexArm Introduces the AR-40 Articulating Torque Reaction Arm in Assembly Show Booth #2314

    See More
  • Assembly In Action: Measurement Arm Rescues E-ONE From Using Inaccurate Parts

    See More

Related Products

See More Products
  • Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line

  • Collaborative Product Assembly Design and Assembly Planning, 1st Edition

See More Products

Events

View AllSubmit An Event
  • August 20, 2025

    K.I.S.S. MES (Keep It Simple, Stupid): Why Modern Manufacturers Are Choosing Modular MES with Real Shop Floor Control

    On Demand If you’re tired of MES that overpromises and underdelivers, it’s time to simplify. Learn how a modular approach gives you control where it counts—without the baggage.Sponsored by:
View AllSubmit An Event

Related Directories

  • ACE Controls Inc.

    ACE Controls Inc., is a leading motion and vibration control technology innovator. We engineer shock absorber, gas spring and vibration solutions for automation, robotics, material-handling, packaging, steel, machine tool, automotive, medical and other industries.
×

Never miss the latest news and trends driving the manufacturing industry

Stay in the know on the latest assembly trends.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More?
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing