The project is expected to add 340 new manufacturing jobs at the factory.
April 25, 2024
PRINCETON, IN—Toyota will invest $1.4 billion in its assembly plant here to build a new, three-row, battery-electric SUV. The project is expected to add 340 new jobs at the factory.
To meet safe launch for an automotive component, a Michigan company had to manufacture 4,000 assemblies with zero defects. MES software helped the company do it.
BERLIN—Engineers at the Fraunhofer Institute for Reliability and Microintegration are developing an inverter that can work at a lower operating temperature.
SINGAPORE—A new flexible die-cut circuit process gives engineers a sustainable way to mass-produce flexible circuits for low-voltage signals in EV battery cell contacting systems.
BERLIN—Starting in February 2027, all new EV traction batteries with a capacity over 2-kilowatt-hours that are marketed in European Union countries will require a digital “passport.”
ZURICH—Doubts over electric vehicle production deadlines may be linked to key skills shortages, according to a recent survey conduced by ABB Robotics and Automotive Manufacturing Solutions.