GRECIA, Costa Rica—
Trelleborg Medical Solutions has opened a 107,000-square-foot manufacturing facility in Costa Rica’s Evolution Free Zone Industrial Park, expanding its global production footprint and adding centralized manufacturing capabilities for medical devices.
ROCKET CENTER, WV—
The 113,000-square-foot facility consolidates production, assembly, testing, and shipping under one roof and is designed to deliver up to 300 advanced strike missiles annually, including the U.S. Navy’s high-speed, extended-range AARGM-ER.
ATLANTA—
Originally slated to open in 2024, the project will now be developed in two phases, with vehicles expected to begin rolling off assembly lines in 2028. Once complete, the plant will be capable of producing up to 400,000 vehicles annually.
CHICAGO—The facility will assemble batteries for Class I, II, and III lift trucks using both domestic and foreign components, enabling the company to boost production flexibility, reduce lead times, lower shipping costs, and enhance local service for U.S. customers.